Appraisal Brief
Get the Full Kit ($97)

Save 10 to 15 Hours Rebuilding Dead QuickLists and Cut 1 to 2+ Hours Off Early UAD 3.6 Reports.

Drop-in Appendix H-1 safe comments, pre-upload XML checks, and AMC fee-defense scripts built for independent residential fee appraisers ahead of the March 1 and May 20, 2027 cutoffs.

Get your 2.6-to-3.6 Quick-Start Sheet on the house (Old-to-New Box Map + 6 QuickList swaps + AMC fee quote).

What Is Actually Eating Your Week Right Now

If you have run even one UAD 3.6 order in TOTAL, ClickForms, ACI, or SFREP, you already feel what nobody at the GSEs or AMCs says out loud:

Why Another 7-Hour CE Course Does Not Fix Monday Morning

You already know how to appraise a house. You do not need another $149 to $495 webinar reading Fannie Mae slides aloud. What is burning your week is the mechanical translation across all 29 dynamic sections of Appendix F-1, Appendix G-1, and Appendix H-1. Mapping that yourself takes 15 to 20 unpaid hours you do not have between inspections.

Everything Inside the 2.6-to-3.6 Complete Kit (Tagged Print vs. On-Screen)

Zero guesswork on how to use each file. Every piece is tagged for either your clipboard, your email, or your second monitor, with realistic time-box estimates:

1. QuickList & AMC Script Vault (150 Swaps + 8 AMC Scripts) - [OPEN ON SCREEN | ~7-13 min/report vs. 35-75 min typing]

100% offline Quick-Copy Hub (instant search + 1-click Copy into TOTAL, ClickForms, ACI, SFREP, or Outlook, plus plain-text backup). Covers discrete comp weighting, ANSI Z765-2021 six-field area and NSFA, split Section 08/10/15 Q&C ratings, remodel windows, itemized DDD tables (None / Repair / Inspection / Completion), detached/attached ADUs, Section 17/22 Contract-Date time adjustments, and rejected comps.

2. Driveway Exit Sheet + 2.6-to-3.6 Field Map - [PRINT FOR CLIPBOARD & MONITOR | ~2 min/property]

Page 1 is a 12-point driveway check that helps prevent 60-to-90-minute return trips for missed Section 05, 06, 08, 10, or 12 photos and measurements. Page 2 is a 1-page lookup showing where old Form 1004, 1073, and 1025 boxes moved across UAD 3.6.

3. Pre-Upload Check Sheet (35-Point XML Scrubber) - [PRINT BY KEYBOARD | ~3 min before XML export]

One page you run right before exporting XML to catch Appendix H-1 Fatal Edits and SSR warnings while the report is still open, cutting 15 to 30+ minutes of post-export debugging and stip loops.

4. Pre-Inspection Prep Sheet (White-Label Agent PDF) - [OPEN ON SCREEN + EMAIL TO AGENT | ~1 min prep]

Standard and complex-property UAD 3.6 fee quotes (+$50 to +$200/order scope defense), the Post-Inspection 2.6-to-3.6 Scope-Change Letter, 5 Appendix F-1 / H-1 ghost-stip pushback scripts, and a 1-page white-label Listing-Agent Pre-Inspection Checklist PDF you email ahead of arrival.

Flip Through the Actual Files Before You Spend a Dollar

No stock mockups. Click through the live files included inside your download:

UAD 3.6 Desk Kit Preview
1 of 4: Offline 1-Click Quick-Copy Hub (150 QuickLists + 8 AMC/Stip Scripts)

Simple Math: One Fee Bump Covers the Kit on Order #1

One +$150 to +$300 AMC fee adjustment or two saved hours pays for the entire kit on your next UAD 3.6 assignment.

Core QuickList Pack
$59
  • 150-Item Offline Quick-Copy Hub + Plain-Text Backup
  • 35-Point Pre-Upload XML Scrubber PDF
Get Core Pack ($59)
Multi-Appraiser Shop
$137
  • Everything in the Complete Desk Kit
  • Office license for up to 5 appraisers in your shop
Get Shop License ($137)
Optional Add-On (+$27): 2027 GSE Cliff Update Pass. Receive every updated QuickList, scrubber check, and pushback script through the March 1, 2027 (legacy 2.6 R&W relief loss) and May 20, 2027 (UCDP Fatal Rejection) cliffs as Fannie Mae and Freddie Mac patch Appendix H-1.
Permanent Offline Files + 30-Day Field-Test Guarantee. Every order delivers immediate, permanent offline files (HTML Quick-Copy Hub, plain-text backup, and PDFs) with no recurring subscription or login that can lock you out. Because this is a self-serve desk kit for licensed appraisers (not consulting or custom report review), v1 includes the full launch package; optional 2027 Appendix H-1 spec patches are available separately via the Update Pass. Put the Quick-Copy Hub, Scrubber, and AMC scripts to work on your next UAD 3.6 order. If they do not save you measurable desk time or pay for themselves on the job, reply to your receipt within 30 days for a full refund.